What need to see before the start of a new concrete batch plant?
Before the start of a new concrete batch plant need to do pre-commissioning and preparation.
In the initial operation of the new concrete batch plant,appear card material is a common problem. It is recommended not to use brute force, you can follow the instructions or batching plant manufacturer to guide the operation.
1,check whether each part of the lubricating grease is good enough, to be observed in the mixing barrel when debugging with four shaft end seal plate oil overflow.
2,check the installation condition of each part, whether the connecting bolt fastening, the chain of connection is reliable.
3,check the configuration of the pneumatic system is normal, the discharge door is in the closed position
4, Check whether there is a foreign body in the mixing tank, tighten the liner again, leaves, stirring arm bolts to prevent falling off.
5,check with its supporting electrical system is normal.
6, check with matching water supply, aggregate, powder system is normal.
7, the clearance between the plate and mixing console blade is not more than 5 mm, more than when the clearance to adjust, the normal production conditions, the mixing console blade use need to be replaced after 37000 times, 25000 times of blade, the control room grounding resistance 4 o.