In addition to the daily maintenance of the concrete batch plant can improve the production efficiency of concrete batch plant, there are three other points will affect its production efficiency.
1, the concrete batch plant feeding time, mixing time and the impact of the expected time
Users in the use of the process to regularly check the butterfly valve and related electrical components to ensure smooth operation of the body, powder hopper and the connection between the mixer is smooth, to ensure feeding.
2, the mixing time of concrete batch plant
For the mixing time, the user should check the integrity of the blade inside the mixer liner, the location of raw materials put, put the time period, whether there is a clash phenomenon affect the mixing effect and time; for the discharge time, the general use of increased concrete hopper capacity Or the concrete hopper is designed to store the container to reduce the discharge time.
3, concrete batch plant transport equipment
Users should be based on the concrete batch plant production capacity and transport distance, equipped with enough concrete mixer truck, and will not produce too much concrete can not be timely transport, affecting the progress of the project.