Concrete batch plant site steps in detail:
First. Clean up the construction site
After the site is selected, the debris and sludge are removed by excavator and transported to the designated site.
Second, site excavation
In the site before the excavation for the top of the slope cut ditch, and see the soil conditions for anti-seepage work. Site excavation must be excavated from top to bottom, shall not dig, digging and digging, excavation to the top of the site should pay attention to reserve the height of settlement, when encountered stone, the use of hammer construction. After excavation to the design elevation, the rolling compact and smooth, can not meet the carrying capacity requirements of the use of stone for the fill.
Third. Hardening of the site
Forth. concrete batching plant, silo foundation
Fifth.Silo
The cement silo placement in the mixing host rear concrete mixing station, which is divided into six silo, two sand storehouse, warehouse, four stone points silo partition USES “37” masonry wall height not less than 1.8 m, with cement mortar plaster, warehouse ground set within 5% of the surface slope, reserved holes under bin partition, avoid water, all kinds of bin area to differentiate clearly, set up the material sign, 40 * 750 px, indicate the name of the material, producing area, specifications, units, quality, etc.Install the water pipe on the edge of the bunker, so that in the precondition of contaminated rinse.
Sixth, wall of concrete batch plant
Mixing station to take closed management, according to the actual situation of the scene, surrounded by brick walls closed, with 24 walls, 2m high, every 6m spacing masonry a brick
The last is drainage
Concrete batch plant site in the flat site and hardening site, the overall control to set the drainage on both sides, set 3% of the longitudinal slope, the venue around the set 40 × 40 drains to ensure smooth drainage of the site; six silos in the hardening site Make a single 5% of the drainage slope