The cleaning of the concrete batch plant sounds like a very easy thing, but if done not well, it will directly affect the use of the concrete batching plant.
First, regular maintenance procedures under the provisions of the maintenance, maintenance operations, such as cleaning, lubrication, refueling and so on.
Second, it is forbidden to remove the concrete accumulated in the concrete mixing station tube with a sledgehammer method, which can only be removed with a chisel.
Third, in the cold season, after the completion of the application of water cleaning concrete mixer drum and water pump, water tank, water inside the water put the net, so as not to water pumps, water tanks, water pipes and other frozen.
Fourth, before the concrete mixing station working first check the controller is good, after stopping the use of water and stones into the mixing tube 10 to 15 minutes for cleaning, and then clear the water and stones. If the operator is required to enter the mixing cylinder to clean, in addition to cut off the power and remove the fuse, and to lock the switch box.